Projects

Project experience

Installations and work in progress, documented with verified details only. Where a detail isn't confirmed, we leave it out.

Installations

Recent work

More project records, and effluent laboratory results as they become available, will be added here.

Grey electrocoagulation and treatment tanks, a control panel with indicator lights and a blue filtration tank inside a tiled plant room.
Installed · 2026

HOP treatment system

Treatment tanks, media filtration and control panel installed in a dedicated plant room.

Location
Silang, Cavite
System
Hybrid Oxidation Process
Scope
Installation
Date
February 2026

How we document

Evidence you can check.

Verified details only

What we publish

Each project lists only what we can confirm: location, system, scope and date. Fields we can't verify are left out rather than estimated.

Laboratory results

How we report testing

Where effluent has been tested, results are published with the laboratory, the sample date and the applicable standard. A laboratory result is not a discharge permit or a government certification, and we don't present it as one.

Contact

Planning a project like this?

Start here. It takes about a minute.

Let's understand your facility, your wastewater and your treatment requirements.

  1. 01Tell us about your facility and the problem you're seeing.
  2. 02We review the details and follow up to understand your wastewater and requirements.
  3. 03We recommend a practical way forward: assessment, design, upgrade or servicing.
Office
Brgy. Talaga, Capas, Tarlac
What do you need?
Existing STP?

No obligation. We use your details only to respond to this inquiry.