Solutions

From design to long-term servicing.

Sewage treatment plants and wastewater treatment systems for commercial and industrial facilities: designed around your wastewater, built on site and kept running.

What we do

Three ways we work with you.

Whether you're planning a new building or dealing with a plant that no longer performs, the work falls into three parts.

01 · Design

Design

Treatment systems engineered around your wastewater, flow and available space, for new facilities or upgrades to existing plants.

  • Sewage treatment plants
  • Wastewater systems
  • Upgrades
02 · Build

Construction & installation

Civil works, tanks, piping, pumps and control panels, built and installed on site.

  • Civil works
  • Equipment
  • Controls
03 · Care

Servicing & optimisation

Maintenance, troubleshooting and performance improvement to keep treatment plants running within specification.

  • Maintenance
  • Troubleshooting
  • Optimisation
04 · Expertise

Beyond one technology

Our engineers also work with conventional biological systems, so recommendations are based on your wastewater, not on a single product.

  • CAS
  • SBR
  • MBBR
  • MBR
  • EC
  • AOP

Where you are now

New system or existing plant?

The starting point shapes the work. Both begin with understanding your wastewater and your site.

New facilities

Building or expanding

  • Treatment system designed around expected flow and wastewater type
  • Compact, modular HOP units where space is limited
  • Civil works, equipment, piping and controls installed on site
Existing plants

Improving what you have

  • Maintenance and troubleshooting of existing treatment plants
  • Performance optimisation for plants drifting out of specification
  • Upgrades where the current system can no longer keep up

Technologies we work with

Six treatment technologies, one team.

Our engineers have hands-on experience across conventional and advanced treatment processes. HOP combines the last two; the others remain options where they fit better.

01

Conventional activated sludge (CAS)

Aerated microorganisms break down organic matter, then a clarifier separates the treated water from the biomass.

02

Sequencing batch reactor (SBR)

Biological treatment in batches within a single tank: fill, react, settle, decant.

03

Moving bed biofilm reactor (MBBR)

Microorganisms grow on free-moving plastic media inside an aerated tank.

04

Membrane bioreactor (MBR)

Biological treatment combined with membrane filtration to separate treated water from the biomass.

05

Electrocoagulation (EC)

An electric current releases coagulants from sacrificial electrodes to remove solids, oil and colloids.

06

Advanced oxidation (AOP)

UV light and ozone generate hydroxyl radicals that break down hard-to-treat compounds and disinfect.

Industries

Built for the facilities that need it most.

AQUA-HOP systems are designed for commercial and industrial sites where space is tight, loads vary and effluent quality matters.

  • 01

    Restaurants

    Kitchen wastewater with high grease content and loads that swing through the day.

  • 02

    Hotels

    Continuous flows, and no tolerance for odour anywhere near guests.

  • 03

    Resorts

    Sites where treated water returns to sensitive natural surroundings.

  • 04

    Factories

    Process wastewater with parameters that biological systems struggle to treat.

  • 05

    Subdivisions

    Shared treatment systems serving many households.

What the law expects

Penalties are real. Panic isn't a plan.

Fines under the Clean Water Act are steep, and they add up every day. Knowing that is useful. Knowing exactly where your plant stands, before an inspector, a permit renewal or a failed test tells you, is better.

The cost of waiting ₱10k–₱200k / day
At the minimum rate₱70000
At the maximum rate₱1400000

If nothing changes

Tap a step to start the conversation there.

Every day counts. Let’s talk today.

Under RA 9275, fines range from ₱10,000 to ₱200,000 per day and continue until the violation is corrected. Authorities can also order closure, suspension or cessation of operations. Totals are simple arithmetic on that range, for illustration.

Which moment are you in?

Pick the one closest to your situation. We'll start the conversation there.

We'll look at your plant and your effluent before the inspector does, so you know exactly where you stand and what, if anything, needs fixing first.

Your next stepA pre-inspection check of your plant and effluent.

Get your treatment system reviewed and performing well ahead of the renewal, instead of finding problems when the paperwork is due.

Your next stepA system review well before your renewal date.

Design the STP into the project from the start. Compact, modular HOP units fit where conventional tanks won't.

Your next stepAn STP designed around your building from day one.

Odour, grease, cloudy effluent or failed tests: we'll find out why, then fix it through servicing, optimisation or an upgrade.

Your next stepA site check to find out why, then a fix.

Fines keep running daily until the violation is corrected, so time matters. Talk to us today and we'll help you work out the fastest route back into compliance.

Your next stepA priority conversation about your fastest route back into compliance.

Talk to an STP Specialist
RA 9275 · Clean Water ActDAO 2016-08DAO 2021-19

General information, not legal advice.

Contact

Which solution fits your facility?

Start here. It takes about a minute.

Let's understand your facility, your wastewater and your treatment requirements.

  1. 01Tell us about your facility and the problem you're seeing.
  2. 02We review the details and follow up to understand your wastewater and requirements.
  3. 03We recommend a practical way forward: assessment, design, upgrade or servicing.
Office
Brgy. Talaga, Capas, Tarlac
What do you need?
Existing STP?

No obligation. We use your details only to respond to this inquiry.